(insert process of how to notify us) How to notify us
Structures - must be notified to the CAA at least 90 days before construction on form:
- (change to OAD form to be developed)
Other activities - listed above must be notified at least five working days before the activity and CAA permissions for Notam, etc to either:
- the Air Traffic Control unit for authorization if the light, laser, weapon, or pyrotechnic display will occur within a control zone whilst the ATC unit is on watch;
- OR the CAA Aeronautical Services Unit for all other hazards outside controlled airspace on form: